Past Projects
![](https://asicanada.ca/wp-content/uploads/2024/04/CCC2022.jpg)
Arthur J.E. Child Comprehensive Cancer Centre (Calgary, AB)
We proudly installed 12,000+ washroom accessories, 1,100+ Visual Display boards, 90+ Change and Washrooms stalls throughout the building’s vast 14 floors. In a period of 18 months. During COVID times
![](https://asicanada.ca/wp-content/uploads/2024/04/AnneAnderson.jpg)
Dr. Ann Anderson (Edmonton, AB)
We assembled and installed 1,730 lockers in roughly 2 months.
![](https://asicanada.ca/wp-content/uploads/2024/04/BalfourCollegiate.jpg)
Regina High Schools (Regina, SK)
We removed and recycled 3200 lockers. Assembled and installed 3200 shiny new lockers. All in a span of 35 working days.
![](https://asicanada.ca/wp-content/uploads/2024/04/Stollery1.jpg)
Stollery Children's Hospital
Installed 250 sheets of new acrovyn wall protection in the upgraded Neonatal Pediatric Intensive Care Unit. As well as roughly 2,000 ft of handrails
![](https://asicanada.ca/wp-content/uploads/2024/04/TwinRinks.png)
Twin Ice Rinks Kainai (Standoff, AB)
Supplied and installing 4,480 square feet of HDPE Puckboard
Supplied and installing 1,480 square feet of PVC Wall Protection Panels
![](https://asicanada.ca/wp-content/uploads/2024/04/PetzoicInside.png)
Petzoic Vet Hospital (Calgary, AB)
Supplied and installed 200 sheets of hygienic pvc wall protection panels, anywhere from 4ft above the floor to 10ft high.
![](https://asicanada.ca/wp-content/uploads/2024/04/EllisSt.png)
Ellis St. Market (Kelowna, BC)
Supplied and Installed 170 Sheets hygienic PVC wall protection panels to 10ft above finished floor.